![]() Slab on grade ontario building code code#The building permit process helps to ensure that zoning requirements outlined in municipal by-laws and building safety standards contained in the Ontario Building Code are satisfied. How long does the building permit approval process take?Ī building permit is a licence issued by the Building Department granting you legal permission to start construction on a project.Who obtains approvals from other agencies?.What happens if I fail to obtain a building permit?. ![]() Moreover, the school has become a model for the School Board Viamonde’s future building projects, and continues to note considerable energy costsavings.The following list contains frequently asked questions and their answers. In addition to securing a meritorious LEED Silver certification, the École secondaire Jeunes sans frontières building has also proven itself to be a comfortable, enjoyable learning space for its students. To accommodate cambered precast flooring on the second level, the RAUPEX pipe was affixed using RAILFIX™, then covered with a 2 to 3 in. The RAUPEX pipe was installed at the ground level in a concreteembedded, slab-on-grade design, using a counterflow spiral pattern to promote even surface temperatures. RAUPEX O 2 Barrier pipe and 42 PRO-BALANCE manifolds that were pre-piped with three-way valves into all recessed manifold distribution cabinets. Installed throughout the entire facility, including all classrooms, offices, and the cafeteria and gymnasium, the radiant heating and cooling system consisted of 104,700 ft (31,913 m) of 5/8-in. Coupled with the system’s comfortable, even method of heating and cooling, this analysis made infloor radiant a must-have for the project.” “The results of this analysis, when applied to energy usage calculations for the school, predicted a significant energy savings due to reduced heating/cooling loads and increased efficiencies of the heating and chilled water sources. “To help the school understand the exceptional benefits of a combined radiant heating and cooling system, we supplied a finite element analysis to model the floor construction and resulting floor heating and cooling output,” explained Mark Euteneier, president of Klimatrol Environmental Systems, the project’s REHAU technical associate and supplier. To maximize both occupant comfort and HVAC system efficiency, the project additionally incorporated a unique radiant slab heating and cooling system from REHAU. ![]() ![]() Slab on grade ontario building code professional#These included unique indoor spaces integrated with outdoor landscapes, a green roof, maximized daylighting and displacement ventilation in both the 80,000 ft2 (7,432 m2 ) school building and nearly 11,000 ft 2 (1,022 m 2 ) professional training center. The building project, which earned the Canadian Green Building Council’s LEED® Silver certification and was the first secondary school building to achieve LEED certification in Ontario, incorporated numerous elements of sustainable construction. during the construction of the more than 90,000 ft 2 (8,463 m 2 ) Brampton, Ontario educational facility. ![]() This includes providing a comfortable, healthy and sustainably designed learning environment, which was a primary focus of the school board and Robertson Simmons architects inc. Part of the School Board Viamonde (Conseil Scolaire Viamonde), the École secondaire Jeunes sans frontiers (JSF), a French language high school, is dedicated to fostering an enriched, student-focused learning experience for its students. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |